This project presented unique challenges, requiring Hytronik to deliver a sophisticated retrofit solution that seamlessly integrated with the existing infrastructure:
• Bypassing a failed DALI system while reusing existing cabling: The previous system had become unusable, leaving the lighting dependent on a basic hand-held device. The retrofit needed to restore functionality without disrupting the current wiring setup.
• Ensuring consistent and reliable lighting performance: The old system caused lights to turn on and off unpredictably, disrupting operations and creating confusion among visitors.
• Providing advanced manual and remote control options: A modern, user-friendly system was required to replace the outdated infra-red device, offering flexibility for both on-site and remote management.
• Delivering a scalable solution for future site-wide integration: The new system had to be expandable, allowing for additional zones to be incorporated without major reworks.
• Adapting to a double-height space: The showroom’s expansive layout required sensors capable of covering greater detection ranges efficiently, ensuring uniform lighting across the area.
Comments (0)
Fields marked with asterisks (*) are required.